Pages

Thursday, May 4, 2017

Fiberglassing Commences & Depth Gauge Gets Installed


 Installed a bus bar to ease the installation of wiring to the negative terminal.  Wired in the Depth Gauge.



Panel installed.  SPST throw switch added for Depth Gauge Power to separate it from the main instrument block.




 Depth Gauge Positioned but not yet permanently installed on starboard side of cockpit.

 Fiberglass for the galley being laid down.  Foam on top to facilitate even layout and plastic beneath foam to facilitate removal.


Three layers of fiberglass for the head.  More space now for a composting toilet to be created and installed!

No comments:

Post a Comment

Days 36-38, August 4-6. Homeward bound

Exiting the New River near low is rather exciting. The whole estuary funnels through a narrow channel and can reach high speeds with rapids...